Kozhamkulova st. 2651. Facade works have been completed.
2. Installation of facade lighting has been completed.
3. Paving works have been completed.
4. Installation of courtyard lighting has been completed.
5. The asphalt pavement has been renewed.
6. Roof waterproofing works have been completed.
1. Installation of façade panels on all sides has been completed.
2. Installation of LED strip lighting on the first floor has begun.
3. Granite installation has been completed.
4. Glass installation on all sides is 95% complete.
5. Roof waterproofing is 80% complete.
6. Courtyard lighting has been completed.
7. Landscaping works: paving stone installation is 60% complete.
1. Facade installation (cassette panels) is 90% complete on all sides.
2. Facade lighting installation is 90% complete on all sides.
3. Granite installation on the 1st floor has been completed.
4. Glass installation is 90% complete on all sides.
5. Roof waterproofing is 60% complete.
6. Topping concrete works on level -1 have been completed.
7. Landscaping works have started, including paving stone installation.
8. Fence installation has been completed.
1. Installation of façade panels has been completed on all sides, except for the parapet and lower panels.
2. Installation of façade lighting is 60% complete.
3. Granite installation on the 1st floor is 85% complete.
4. Installation of glazing on all sides is 60% complete.
5. On the 5th floor roof, waterproofing and screed pouring are 75% complete.
6. On the 6th floor roof, waterproofing and screed pouring are 100% complete.
7. On the -1 floor, topping pouring is 70% complete.
8. Landscaping: soil cutting has been completed; ballast filling and compaction have begun.
9. Fence installation has been completed on the Shevchenko–Mukanova side; work on the Zhambyl side is ongoing.
1. KM works have been fully completed.
2. Roof waterproofing works have started.
3. Ground cutting works have started.
4. Fence frame installation works have started.
5. Glazing works on the Kozhamkulov side have started.
6. Preparatory works for topping have started.
1. Installation of mineral wool boards with Izospan has been completed on all sides.
2. Stained-glass frame structures have been installed on all sides.
3. Stained-glass frames of the 1st floor have been installed on all sides.
4. Welding of metal structures on the 6th floor with additional modifications has been completed.
5. Reinforcement and preparation for concrete pouring of the 6th-floor roof are in progress.
6. Stained-glass bases on the 6th floor have been installed.
7. Works on the water metering unit are in progress.
8. Works on the pump BTP unit are in progress.
9. Façade installation from the 2nd to the 5th floor is in progress (Shevchenko – Kozhamkulova – Zhambyla sides).
10. Granite installation on the 1st floor is in progress (Shevchenko – Kozhamkulova – Zhambyla sides).
11. Glass installation is in progress on the Kozhamkulova side.
12. Preparatory works for fence installation are underway.
1. Installation of mineral wool insulation with Izospan has been completed on all sides.
2. Stained glass frames have been installed on all sides.
3. Stained glass frames on the 1st floor have been installed on all sides.
4. Welding of metal structures on the 6th floor, including additional modifications, has been completed.
5. Reinforcement of the 6th floor roof has been completed, and preparations for concrete pouring are in progress.
6. Reinforcement of pedestals for stained glass structures on the 6th floor has been completed for subsequent concrete pouring.
7. Works on the water metering unit are in progress.
8. Works on the pump room of the ITP (Individual Heating Point) are in progress.
1. Installation of mineral wool boards with isospan on the sides of Kozhamkulov and Shevchenko streets has been completed.
2. Stained-glass frame structures have been installed on the sides of Shevchenko, Kozhamkulov, and Zhambyl streets.
3. Installation of stained-glass frames on the 1st floor on the Shevchenko side is in progress.
4. Welding of metal structures on the 6th floor with additional modifications is being carried out.
• Façade works have been initiated.
• Installation of glazing (stained glass) structures has been initiated.
• Installation works of steel structures (KM) on the 6th floor have been initiated.
1. Monolithic works have been fully completed.
2. Masonry works have been fully completed.
3. Parapet installation has been fully completed.
4. Finishing works in technical premises have been completed.
5. The transformer substation has been installed.
1. Monolithic works of the 5th floor have been completed.
2. Masonry works of the 5th floor have been completed.
3. Finishing works in technical rooms have been started.
4. Works on pouring the retaining walls have been started.
5. Works on the transformer substation have been started.
1. External utility networks have been completed and connected to the building.
2. Concrete works for the walls of the 5th floor have been completed.
3. Reinforcement of the 5th-floor slab is in progress.
4. Basement masonry is 80% complete.
5. Masonry of the exterior walls on the 2nd and 3rd floors is completed.
6. Masonry on the 1st floor is 30% complete.
7. Masonry work on the 4th floor has begun.
8. Floor screed work has started in the technical rooms of the basement.
Excavation pit preparation
Preparatory work is underway
Project and cost estimate documentation is currently under development.